Siempelkamp-Kastamonu Entegre: new plant

In June, Kastamonu Entegre placed an order with Siempelkamp for a new particleboard plant for its location in Kastamonu City. The new plant corresponds to the design of the particleboard plant that Kastamonu Entegre has been operating at the Samsun site since February 2021. It produces reliably following a smooth project flow and excellent teamwork of all parties involved – despite the restrictions set by the “Covid-19” pandemic. This plant, as well as the one currently on order, contains a 7’ x 37.1 meter ContiRoll and is designed
for a daily output of two thousands cubic meters. 
At the plant in Kastamonu City the Turkish wood-based panel producer has already been operating a Siempelkamp plant for the production of mdf and hdf since 2007. With the new particleboard plant at this location, Kastamonu Entegre is expanding its range of boards for the domestic furniture industry. 

Read also...

26/03/2026

LAGO launches its first outdoor collection, extending its design vision beyond interiors

18/03/2026

Mmfa: a 2025 exceeding 100 million square metres

18/03/2026

The new “Wallteq M-300” by Weinmann

18/03/2026

Altendorf introduces new F 30 sliding table saw for the craft segment

17/03/2026

“Ecobox” and “Osb Flammex”: Egger’s new solutions

17/03/2026

Over 300 attendees in Lazise: Holzbau Forum Italia and the future of timber construction